Set 42
Technical information
- M24 male thread
- One pipe and two pipe
- connection to the floor
- Thermostatic head left or right
- default setting in 6 steps
- flow and return completely lockable
- Tested to DIN EN 215
- Kv-value two pipe: 0.29 to 1.65 m³/h.
Kv-value one pipe: 1.50 to 2.20 m³/h. - With screw thread M30 x 1.5 (Heimeier compatible)
- With synthetic spindle protection for setting on site
Composition of the order code
Order code
Valve, control and sleeve couplings are included in the price
CODE.PF3.AC.1... | AC |
CODE.PF3.AW.1... | AW |
CODE.PF3.AS.1... | AS |
CODE.PF3.AB.1... | AB |
CODE.PF3.JH.1... | JH |
CODE.PF3.HC.1... | HC |
CODE.PF3.MA.1... | MA |
fill in sleeve coupling code
Sleeve coupling
-
M24 Sleeve coupling - synthetic
Complete ordering code connection set with code sleeve couplings according to the used material and ø of the tube.synthetic
Code Tube Ø 212 12/2 214 14/2 219 16/1.5 216 16/2 217 17/2 218 18/2 Max. Tightening Torque
- synthetic: 30-40 Nm
-
M24 Sleeve coupling - RPE/ALU
Complete ordering code connection set with code sleeve couplings according to the used material and ø of the tube.RPE/ALU
Code Tube Ø 314 14/2 316 16/2 326 16/2.2 318 18/2 Max. Tightening Torque
- RPE/ALU: 20-30 Nm
-
M24 Sleeve coupling - steel tube for C.H.
Complete ordering code connection set with code sleeve couplings according to the used material and ø of the tube.steel tube for c.h.
Code Tube Ø 501 M24 x 1/2" 503 M24 x 3/8" -
M24 Sleeve coupling - precision metal tube
Complete ordering code connection set with code sleeve couplings according to the used material and ø of the tube.precision metal tube
Code Tube Ø 110 10/1 112 12/1 114 14/1 115 15/1 116 16/1 118 18/1 Max. Tightening Torque
- precision metal tube:
- Soft copper: 45-55 Nm
- Semi-hard copper: 60-80 Nm
- Mild steel: 60-70 Nm
- precision metal tube: